Solar + storage project 25-IC-1351, Barbour County

Solar + storage project 25-IC-1351, Barbour County is a 190 MW solar + storage request withdrawn in the Southeast interconnection queue, in Barbour County, Alabama, connecting to Southern Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2025 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25-IC-1351
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Southern Company
Connection point (POI)
Eufaula - Union Springs 115 kV Line
Location
Barbour County, Alabama
Technology
Solar: 190 MW Β· Battery
Total requested
190 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
16 April 2025
Withdrawn
June 2025

Location

Marker shows the centre of Barbour County; the queue data does not give exact sites.

Power plants in Alabama Β· Transmission lines in Alabama

Other requests in Barbour County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem