Other project AD2-080, St. Joseph County

Other project AD2-080, St. Joseph County is a 309 MW other request withdrawn in the PJM interconnection queue, in St. Joseph County, Indiana, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedJun 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AD2-080
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Dumont-Stillwell 345kV
Location
St. Joseph County, Indiana
Technology
Other: 309 MW
Total requested
309 MW
Service type
Energy only (ERIS)
Study phase
Available studies: System Impact Study
Queue status
Withdrawn
Entered queue
19 March 2018
Proposed online date
June 2020
Withdrawn
June 2020

Location

Marker shows the centre of St. Joseph County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in St. Joseph County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem