Solar + storage project C2-141, Walla Walla County

Solar + storage project C2-141, Walla Walla County is a 199 MW solar + storage request withdrawn in the West interconnection queue, in Walla Walla County, Washington, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C2-141
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
ACE DevCo NC, LLC
Connection point (POI)
Walla Walla-Wanapum transmission line
Location
Walla Walla County, Washington
Technology
Solar: 199 MW Β· Battery
Total requested
199 MW
Service type
Energy only (ERIS)
Study phase
LGIA executed on 2/17/2025, suspended 4/2/2025, LGIA terminated 10/28/2025
Queue status
Withdrawn
Entered queue
14 May 2022
Proposed online date
April 2029

Location

Marker shows the centre of Walla Walla County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Walla Walla County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem