United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 208, Dixie County
Solar project 208, Dixie County is a 40.0 MW solar request withdrawn in the Southeast interconnection queue, in Dixie County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 208
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Sanibel Solar, LLC
- Connection point (POI)
- Old Town Substation
- Location
- Dixie County, Florida
- Technology
- Solar: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 22 December 2017
- Proposed online date
- February 2022
Location
Marker shows the centre of Dixie County; the queue data does not give exact sites.
Other requests in Dixie County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem