500MW Taft-Bell

500MW Taft-Bell is a 500 MW gas request withdrawn in the West interconnection queue, in Kootenai County, Idaho, connecting to Cogentrix Energy, Inc..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2000 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G16
Grid region
West (non-ISO utilities)
Utility / transmission owner
Cogentrix Energy, Inc.
Developer
Cogentrix Energy, Inc.
Connection point (POI)
BPA's Taft-Bell 500 kV line in the vicinity of Kootenaid County, ID
Location
Kootenai County, Idaho
Technology
Gas: 500 MW
Total requested
500 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
22 December 2000
Proposed online date
December 2004

Location

Marker shows the centre of Kootenai County; the queue data does not give exact sites.

Power plants in Idaho Β· Transmission lines in Idaho

Other requests in Kootenai County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem