Onshore wind project GEN-2016-006, Haakon County

Onshore wind project GEN-2016-006, Haakon County is a 140 MW onshore wind request withdrawn in the SPP interconnection queue, in Haakon County, South Dakota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandonedAug 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-006
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Philip Tap; New Underwood-Oahe 230 kV
Location
Haakon County, South Dakota
Technology
Wind: 140 MW
Total requested
140 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
28 March 2016
Proposed online date
December 2018
Withdrawn
August 2016

Location

Marker shows the centre of Haakon County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Haakon County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem