United States › Grid › Interconnection queues › Kansas
SOLAR + STORAGE · SPPSolar + storage project GEN-2024-069, Crawford County
Solar + storage project GEN-2024-069, Crawford County is a 228 MW solar + storage request in interconnection study in the SPP interconnection queue, in Crawford County, Kansas, connecting to WERE.
Queue statusIn planning
- PlanningQueued Oct 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-069
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Connection point (POI)
- Franklin 69 kV Substation
- Location
- Crawford County, Kansas
- Technology
- Solar: 228 MW · Battery
- Total requested
- 228 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 30 October 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Crawford County; the queue data does not give exact sites.
Other requests in Crawford County
- Solar project GEN-2024-287, Crawford CountySolar · 200 MW · in study
- Gas project GEN-2012-044, Crawford CountyGas · 2.0 MW · built
- Gas project GEN-2003-012, Crawford CountyGas · 350 MW · withdrawn
- Wind + storage project GEN-2023-231, Crawford CountyWind + storage · 310 MW · withdrawn
- Battery storage project GEN-2023-025, Crawford CountyBattery storage · 200 MW · withdrawn
- Solar project GEN-2017-050, Crawford CountySolar · 25.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem