United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

GAS Β· MISO

Gas project J914, Manistee County

Gas project J914, Manistee County is a 30.0 MW gas request withdrawn in the MISO interconnection queue, in Manistee County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2017 (completed)
  2. Withdrawn / abandonedJan 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J914
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Filer City 138 kV Substation
Location
Manistee County, Michigan
Technology
Gas: 30.0 MW
Total requested
30.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
16 June 2017
Proposed online date
October 2019
Withdrawn
January 2019

Location

Marker shows the centre of Manistee County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Manistee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem