United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOAgate Storage Project
Agate Storage Project is a 200 MW battery storage request withdrawn in the NYISO interconnection queue, in Dutchess County, New York, connecting to CHG&E.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1303
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CHG&E
- Developer
- Hanwha Q Cells USA
- Connection point (POI)
- Manchester 115 kV substation
- Location
- Dutchess County, New York
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 12 November 2021
Location
Marker shows the centre of Dutchess County; the queue data does not give exact sites.
Other requests in Dutchess County
- East FishkillBattery storage · 205 MW · in study
- Highbush Energy StorageBattery storage · 200 MW · in study
- Overlook StorageBattery storage · 199 MW · in study
- Aria Storage 2Battery storage · 150 MW · in study
- Aria Storage 1Battery storage · 100 MW · in study
- Cricket Valley Energy Center IIGas · 1,132 MW · built
- Cricket Valley Energy Center IIGas · 1,132 MW · built
- Cricket Valley Project (QP444 in NYISO Queue)Gas · 1,020 MW · built
- Cricket Valley Energy CenterGas · 1,136 MW · withdrawn
- Dover NY BESSBattery storage · 1,000 MW · withdrawn
- Dover NY BESS (NYISO-C24-316)Battery storage · 1,000 MW · withdrawn
- Wingdale Energy CenterGas · 650 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem