United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMSolar project AG2-554, Centre County
Solar project AG2-554, Centre County is a 10.0 MW solar request withdrawn in the PJM interconnection queue, in Centre County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-554
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- East End 46 kV
- Location
- Centre County, Pennsylvania
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2021
- Proposed online date
- December 2023
- Withdrawn
- September 2023
Location
Marker shows the centre of Centre County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Centre County
- Black Moshannon SolarSolar + storage Β· 95.0 MW Β· agreement signed
- MPG SolarSolar Β· 83.6 MW Β· agreement signed
- MPG SolarSolar Β· 78.4 MW Β· agreement signed
- Black Moshannon SolarSolar Β· 20.0 MW Β· agreement signed
- Black Moshannon SolarSolar Β· 20.0 MW Β· agreement signed
- Solar project AI2-154, Centre CountySolar Β· 24.0 MW Β· in study
- Solar + storage project AI2-439, Centre CountySolar + storage Β· 20.0 MW Β· in study
- Solar + storage project AI1-216, Centre CountySolar + storage Β· 20.0 MW Β· in study
- Solar + storage project AI1-214, Centre CountySolar + storage Β· 20.0 MW Β· in study
- Solar + storage project AI1-215, Centre CountySolar + storage Β· 20.0 MW Β· in study
- Solar + storage project AI2-440, Centre CountySolar + storage Β· 20.0 MW Β· in study
- Solar + storage project AI1-217, Centre CountySolar + storage Β· 17.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem