United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMSolar project AH1-471, Snyder County
Solar project AH1-471, Snyder County is a 15.0 MW solar request withdrawn in the PJM interconnection queue, in Snyder County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-471
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Derry Tap- Derry Bus 69 kV VI
- Location
- Snyder County, Pennsylvania
- Technology
- Solar: 15.0 MW
- Total requested
- 15.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 September 2021
- Proposed online date
- September 2023
- Withdrawn
- December 2024
Location
Marker shows the centre of Snyder County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Snyder County
- Washington West SolarSolar + storage Β· 40.0 MW Β· agreement signed
- Washington East SolarSolar + storage Β· 20.0 MW Β· agreement signed
- Sunbury Generation FacilityGas Β· 416 MW Β· built
- Sunbury Generation FacilityGas Β· 381 MW Β· built
- Sunbury Generation FacilityGas Β· 227 MW Β· built
- Sunbury Generation FacilityGas Β· 97.0 MW Β· built
- Penn Solar (Cottontail 6)Solar Β· 20.0 MW Β· built
- Sunbury #1Coal Β· 10.0 MW Β· built
- Sunbury #1Coal Β· 10.0 MW Β· built
- Gas project AA2-182, Snyder CountyGas Β· 1,030 MW Β· withdrawn
- Coal project R04, Snyder CountyCoal Β· 817 MW Β· withdrawn
- Gas project AF1-235, Snyder CountyGas Β· 617 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem