United States βΊ Grid βΊ Interconnection queues βΊ Ohio
GAS Β· PJMGas project AH1-724, Harrison County
Gas project AH1-724, Harrison County is a 650 MW gas request withdrawn in the PJM interconnection queue, in Harrison County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedMay 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-724
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Developer
- Pogona Power LLC
- Connection point (POI)
- Nottingham 138 kV
- Location
- Harrison County, Ohio
- Technology
- Gas: 650 MW
- Total requested
- 650 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Proposed online date
- May 2030
- Withdrawn
- May 2025
Location
Marker shows the centre of Harrison County; the queue data does not give exact sites.
Other requests in Harrison County
- Solar project AH1-580, Harrison CountySolar Β· 200 MW Β· in study
- Solar project AG2-082, Harrison CountySolar Β· 200 MW Β· in study
- Solar project AI2-336, Harrison CountySolar Β· 34.6 MW Β· in study
- Solar project AI2-346, Harrison CountySolar Β· 20.0 MW Β· in study
- Nottingham SolarSolar Β· 100 MW Β· suspended
- Harrison Power PlantGas Β· 1,050 MW Β· withdrawn
- Harrison Power PlantGas Β· 35.0 MW Β· withdrawn
- Solar project AH1-235, Harrison CountySolar Β· 8.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem