SOLAR Β· WEST

Solar project 49, Pima County

Solar project 49, Pima County is a 200 MW solar request withdrawn in the West interconnection queue, in Pima County, Arizona, connecting to Tucson Electric Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
49
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tucson Electric Power Company
Connection point (POI)
Proposed Marana 138kV Substation
Location
Pima County, Arizona
Technology
Solar: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
8 September 2016
Proposed online date
June 2019

Location

Marker shows the centre of Pima County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Pima County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem