United States › Grid › Interconnection queues › Pennsylvania

SOLAR + STORAGE · PJM

Greenwood Solar II

Greenwood Solar II is a 96.2 MW solar + storage request withdrawn in the PJM interconnection queue, in Perry County, Pennsylvania, connecting to PPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-533
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PPL
Developer
North Corners Energy, LLC
Connection point (POI)
Sunbury-Juniata II
Location
Perry County, Pennsylvania
Technology
Solar: 96.2 MW · Battery
Total requested
96.2 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
10 September 2021
Proposed online date
March 2025
Withdrawn
July 2025

Location

Marker shows the centre of Perry County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Perry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem