United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESBattery storage interconnection queue in the USA (2016 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project 310, Meagher County Battery storage |
450 MW | Paused / redesign |
| Battery storage project C002, Meagher County Battery storage |
450 MW | Paused / redesign |
| Corby Battery storage |
314 MW | Agreement signed |
| Roccasecca BESS Battery storage |
303 MW | Agreement signed |
| Tahoe Battery storage |
300 MW | Agreement signed |
| Bear Swamp Unit 1 and 2 Upgrade Battery storage |
66.0 MW | Agreement signed |
| Battery storage project GEN-2016-160, Ellis County Battery storage |
20.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)3 Β· 917 MW
- West (non-ISO utilities)2 Β· 900 MW
- ISO-NE (New England)1 Β· 66.0 MW
- SPP (Southwest Power Pool)1 Β· 20.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)