United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Battery storage interconnection queue in the USA (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown101,155 MW
Active in queue1,155 MW10 requests
Agreement signed610 MW7 requests
Withdrawn1105,825 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 687, Klamath County
Battery storage Β· Swan Lake North Hydro, LLC
416 MWIn study Klamath, ORWest Jul 2015target 2031
Big Rock Solar Farm
Battery storage
200 MWAgreement signed Imperial, CACAISO Apr 2015target 2025
Leconte Energy Storage
Battery storage
125 MWAgreement signed Imperial, CACAISO Apr 2015target 2026
Golden Fields Solar
Battery storage
100 MWAgreement signed Kern, CACAISO Apr 2015target 2026
NYC Energy
Battery storage Β· NYC Energy LLC
79.9 MWIn study Kings, NYNYISO Dec 2015target 2027
Willow Springs Solar 4
Battery storage
75.0 MWAgreement signed Kern, CACAISO Apr 2015target 2026
Fallbrook Energy Storage
Battery storage
69.6 MWAgreement signed San Diego, CACAISO Apr 2015target 2026
Battery storage project Q229, Maricopa County
Battery storage
50.0 MWIn study Maricopa, AZWest Sep 2015target 2021
Battery storage project J466, Huron County
Battery storage
30.0 MWAgreement signed Huron, MIMISO May 2015target 2015
Lake Alpaugh Battery Storage
Battery storage
10.0 MWAgreement signed Tulare, CACAISO Apr 2015target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)