OCTARY USA Β· INTERCONNECTION QUEUESBattery storage interconnection queue in the USA (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project 687, Klamath County Battery storage Β· Swan Lake North Hydro, LLC |
416 MW | In study |
| Big Rock Solar Farm Battery storage |
200 MW | Agreement signed |
| Leconte Energy Storage Battery storage |
125 MW | Agreement signed |
| Golden Fields Solar Battery storage |
100 MW | Agreement signed |
| NYC Energy Battery storage Β· NYC Energy LLC |
79.9 MW | In study |
| Willow Springs Solar 4 Battery storage |
75.0 MW | Agreement signed |
| Fallbrook Energy Storage Battery storage |
69.6 MW | Agreement signed |
| Battery storage project Q229, Maricopa County Battery storage |
50.0 MW | In study |
| Battery storage project J466, Huron County Battery storage |
30.0 MW | Agreement signed |
| Lake Alpaugh Battery Storage Battery storage |
10.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)6 Β· 580 MW
- West (non-ISO utilities)2 Β· 466 MW
- NYISO (New York)1 Β· 79.9 MW
- MISO (Midcontinent)1 Β· 30.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)