United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESHydro interconnection queue in the USA (2025 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hydro project J4200, Ramsey County Hydro |
16.0 MW | In study |
| Hydro project T2-077, Bighorn County Hydro |
8.0 MW | In study |
| Hydro project PP00033, Montgomery County Hydro |
6.3 MW | In study |
| Hydro project 977636, Anson County Hydro |
1.5 MW | In study |
| Hydro project 755, Gem County Hydro Β· Emmett Main Canal |
0.1 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)1 Β· 16.0 MW
- West (non-ISO utilities)2 Β· 8.1 MW
- Southeast (non-ISO utilities)2 Β· 7.8 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)