United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Gas interconnection queue in the USA (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown104,513 MW
Active in queue4,513 MW10 requests
Agreement signed2,753 MW7 requests
Withdrawn13349.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Eagle Pines Gas
Gas Β· FGE Power
1,174 MWIn study Cherokee, TXERCOT Mar 2015target 2028
Trumbull Energy Center
Gas
940 MWAgreement signed Trumbull, OHPJM Oct 2015target 2026
Gas project 137, Pasco County
Gas Β· Seminole Electric Cooperative, Inc.
575 MWUnder construction Pasco, FLSoutheast Nov 2015target 2020
Sullivan Generating Station 1
Gas
575 MWAgreement signed Sullivan, INPJM Oct 2015target 2027
Sullivan Generating Station 2
Gas
575 MWAgreement signed Sullivan, INPJM Oct 2015target 2027
Glen Falls Facility
Gas
550 MWAgreement signed Harrison, WVPJM Apr 2015target 2029
Gas project J514, Marshall County
Gas
65.0 MWAgreement signed Marshall, IAMISO Nov 2015target 2017
Gas project J485, Olmsted County
Gas
46.9 MWAgreement signed Olmsted, MNMISO Oct 20152018
Mirage
Gas
11.0 MWPaused / redesign Harris, TXERCOT Feb 2015
NEA Bell. Uprate (Northeast Energy Associates, LP)
Gas
1.4 MWAgreement signed Norfolk, MAISO-NE Mar 2015target 2018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)