United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESGas interconnection queue in the USA (2014 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project 257, Shelby County Gas |
1,132 MW | Agreement signed |
| Gas project G0501, Klamath County Gas |
1,100 MW | In study |
| FGE Texas 2 Gas Gas Β· FGE Power |
743 MW | Paused / redesign |
| Gas project J351, St. Joseph County Gas |
715 MW | Agreement signed |
| Halyard Wharton Gas Β· Halyard Energy |
484 MW | Paused / redesign |
| Gas project IA-PNM-2014-02, San Juan County Gas |
80.0 MW | Agreement signed |
| Gas project J384, Dane County Gas |
21.0 MW | Agreement signed |
| Gas project 41, Lincoln County Gas |
0.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)2 Β· 1,227 MW
- West (non-ISO utilities)3 Β· 1,180 MW
- Southeast (non-ISO utilities)1 Β· 1,132 MW
- MISO (Midcontinent)2 Β· 736 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)