Queue requests in study in the USA (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown71,899 MW
Active in queue3,270 MW17 requests
Agreement signed1,371 MW10 requests
Withdrawn46255.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project Q44, Millard County
Solar + storage Β· Intermountain Power Agency
450 MWIn study Millard, UTWest Sep 2013target 2018
Hydro project G0490, Douglas County
Hydro
345 MWIn study Douglas, WAWest Jul 2013target 2022
Dworshak Fourth Unit
Hydro
300 MWIn study Clearwater, IDWest Aug 2013target 2019
Cattleman Wind A
Onshore wind Β· RWE Renewables Development, LLC
202 MWPaused / redesign Castro, TXERCOT Sep 2013target 2021
Cattleman Wind B
Onshore wind Β· RWE Renewables Development, LLC
202 MWPaused / redesign Castro, TXERCOT Sep 2013target 2021
Stella 2 Wind
Onshore wind Β· Eon
201 MWPaused / redesign Kenedy, TXERCOT Jun 2013target 2022
Tierra Blanca W
Onshore wind Β· RWE Renewables Development, LLC
200 MWPaused / redesign Randall, TXERCOT Sep 2013target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)