United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in the USA (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown121,772 MW
Active in queue1,925 MW19 requests
Agreement signed152 MW7 requests
Withdrawn39770.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project G0478, Morrow County
Solar + storage
500 MWIn study Morrow, ORWest Sep 2012target 2016
Gas project 12-051, Cowlitz County
Gas
375 MWPaused / redesign Cowlitz, WAWest Jul 2012target 2016
Onshore wind project IA-PNM-2012-05, Guadalupe Cty County
Onshore wind
198 MWIn study Guadalupe Cty, NMWest Dec 2012target 2015
Solar + storage project Q30, Kern County
Solar + storage
170 MWPaused / redesign Kern, CAWest Jun 2012target 2014
Battery storage project 12-052, Marion County
Battery storage
100 MWPaused / redesign Marion, ORWest Oct 2012target 2014
Battery storage project 12-054, Clackamas County
Battery storage
100 MWPaused / redesign Clackamas, ORWest Dec 2012target 2014
Onshore wind project 12-053, Polk County
Onshore wind
87.5 MWPaused / redesign Polk, ORWest Oct 2012target 2015
Gas project 12-049, Morrow County
Gas
75.0 MWPaused / redesign Morrow, ORWest Feb 2012target 2013
Onshore wind project GI-2012-3, Logan County
Onshore wind
60.0 MWIn study Logan, COWest May 2012target 2013
Coal project 12-047, Morrow County
Coal
44.0 MWPaused / redesign Morrow, ORWest Feb 2012target 2012
Coal project GI-48, Randolph County
Coal
33.0 MWIn study Randolph, MOSoutheast Oct 2012target 2012
Gas project 12-048, Morrow County
Gas
30.0 MWPaused / redesign Morrow, ORWest Feb 2012target 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)