United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in the USA (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown13843 MW
Active in queue452.0 GW1,836 requests
Agreement signed4,701 MW27 requests
Withdrawn47497.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project 757, Baker County
Hydro Β· Idaho Power Company - Power Supply
220 MWOperating Baker, ORWest Mar 2025
Hydro project 795, Power County
Hydro Β· Idaho Power Company - Power Supply
118 MWOperating Power, IDWest Jul 2025
V2 Brooks Field DGR
Other Β· Life Cycle Power
76.5 MWOperating Bexar, TXERCOT Jun 20252025
P2 Highland Hills DGR
Other Β· Life Cycle Power
66.0 MWOperating ERCOT Jun 20252025
Z0 Beck Road DGR
Other Β· Life Cycle Power
60.0 MWOperating Bexar, TXERCOT Jun 20252025
Other project 753, Twin Falls County
Other Β· Idaho Power Company-Power Supply
59.0 MWOperating Twin Falls, IDWest Jan 2025
K2 Nacogdoches DGR
Other Β· Life Cycle Power
58.0 MWOperating ERCOT Jun 20252025
A4 Pearsall DGR
Other Β· Life Cycle Power
58.0 MWOperating ERCOT Jun 20252025
V4 Palo Alto DGR
Other Β· Life Cycle Power
33.0 MWOperating ERCOT Jun 20252025
Q1 Valley Road DGR
Other Β· Life Cycle Power
29.0 MWOperating ERCOT Jun 20252025
Z5 Southton DGR
Other Β· Life Cycle Power
29.0 MWOperating ERCOT Jun 20252025
X1 Medina Base DGR
Other Β· Life Cycle Power
29.0 MWOperating ERCOT Jun 20252025
Hydro project 794, Jerome County
Hydro Β· North Side Energy Company, Inc.
7.7 MWOperating Jerome, IDWest Apr 2025target 2011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)