Queue projects under construction in the USA (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3210 MW
Active in queue452.0 GW1,836 requests
Agreement signed4,701 MW27 requests
Withdrawn47497.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project PP00008, Darlington County
Solar
74.9 MWUnder construction Darlington, SCSoutheast Jan 2025target 2028
Solar project PP00009, Darlington County
Solar
74.9 MWUnder construction Darlington, SCSoutheast Jan 2025target 2028
Solar project PP00010, Lee County
Solar
60.0 MWUnder construction Lee, SCSoutheast Jan 2025target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)