United States βΊ Grid βΊ Interconnection queues βΊ Wyoming
OCTARY USA Β· INTERCONNECTION QUEUESOther interconnection queue in Wyoming
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Other project 607, Sweetwater County Other Β· NextEra Energy Resources Interconnection Holdings, LLC |
300 MW | Paused / redesign |
| Other project CLPT G17, Laramie County Other Β· NextEra Energy Resources Interconnection Holdings, LLC |
300 MW | Agreement signed |
| Other project CLPT G16, Platte County Other Β· NextEra Energy Resources Interconnection Holdings, LLC |
300 MW | Agreement signed |
| Other project 608, Sweetwater County Other Β· NextEra Energy Resources Interconnection Holdings, LLC |
300 MW | Paused / redesign |
| Other project 37681, Platte County Other |
200 MW | In study |
| Other project 38047, Platte County Other |
200 MW | In study |
| Other project 38412, Goshen County Other |
200 MW | In study |
| Other project 609, Sweetwater County Other Β· NextEra Energy Resources Interconnection Holdings, LLC |
200 MW | Paused / redesign |
| Other project CLPT G29, Laramie County Other |
150 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)