United States βΊ Grid βΊ Interconnection queues βΊ Wyoming
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Wyoming (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project 1217, Uinta County Battery storage |
350 MW | Withdrawn / abandoned |
| Solar + storage project 1209, Sweetwater County Solar + storage |
200 MW | Withdrawn / abandoned |
| Onshore wind project 1223, Carbon County Onshore wind |
79.4 MW | Withdrawn / abandoned |
| Solar + storage project 1229, Sweetwater County Solar + storage |
20.0 MW | Withdrawn / abandoned |
| Solar + storage project 1228, Sweetwater County Solar + storage |
20.0 MW | Withdrawn / abandoned |
| Solar + storage project 1226, Sweetwater County Solar + storage |
20.0 MW | Withdrawn / abandoned |
| Solar + storage project 1227, Sweetwater County Solar + storage |
20.0 MW | Withdrawn / abandoned |
| Solar + storage project 1196, Big Horn County Solar + storage |
20.0 MW | Withdrawn / abandoned |
| Solar + storage project 1230, Sweetwater County Solar + storage |
20.0 MW | Withdrawn / abandoned |
| Solar + storage project 1195, Big Horn County Solar + storage |
20.0 MW | Withdrawn / abandoned |
| Solar + storage project 1231, Sweetwater County Solar + storage |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)