BATTERY STORAGE Β· WEST

Battery storage project 1217, Uinta County

Battery storage project 1217, Uinta County is a 350 MW battery storage request withdrawn in the West interconnection queue, in Uinta County, Wyoming, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1217
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Evanston-Anschutz transmission line
Location
Uinta County, Wyoming
Technology
Battery: 350 MW
Total requested
350 MW
Service type
NRIS and ERIS
Study phase
Request submitted post queue reform effective date
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
June 2024

Location

Marker shows the centre of Uinta County; the queue data does not give exact sites.

Power plants in Wyoming Β· Transmission lines in Wyoming

Other requests in Uinta County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem