United States βΊ Grid βΊ Interconnection queues βΊ Wyoming
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Wyoming (2018 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project 1016, Carbon County Onshore wind |
502 MW | Withdrawn / abandoned |
| Onshore wind project 1015, Carbon County Onshore wind |
502 MW | Withdrawn / abandoned |
| Onshore wind project 1014, Carbon County Onshore wind |
100 MW | Withdrawn / abandoned |
| Solar + storage project 1013, Converse County Solar + storage |
80.0 MW | Withdrawn / abandoned |
| Solar project TCS-16, Lincoln County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project TCS-19, Sublette County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project 1085, Sublette County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project 1078, Lincoln County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project 1080, Lincoln County Solar |
75.0 MW | Withdrawn / abandoned |
| Solar project 1081, Lincoln County Solar |
75.0 MW | Withdrawn / abandoned |
| Solar project 1076, Lincoln County Solar |
58.0 MW | Withdrawn / abandoned |
| Solar + storage project TCS-23, Sweetwater County Solar + storage |
50.0 MW | Withdrawn / abandoned |
| Solar + storage project 1095, Sweetwater County Solar + storage |
50.0 MW | Withdrawn / abandoned |
| Gas project 1079, Sweetwater County Gas |
25.5 MW | Withdrawn / abandoned |
| Solar project 1082, Lincoln County Solar |
10.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)