United States βΊ Grid βΊ Interconnection queues βΊ Wyoming
SOLAR Β· WESTSolar project 1085, Sublette County
Solar project 1085, Sublette County is a 80.0 MW solar request withdrawn in the West interconnection queue, in Sublette County, Wyoming, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1085
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Chimney Butte substation
- Location
- Sublette County, Wyoming
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Request moved to transition cluster
- Queue status
- Withdrawn
- Entered queue
- 13 November 2018
- Proposed online date
- November 2020
Location
Marker shows the centre of Sublette County; the queue data does not give exact sites.
Other requests in Sublette County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem