United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Wisconsin (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6898 MW
Active in queue1,212 MW6 requests
Agreement signed0.0 MW0 requests
Withdrawn8714 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J850, Rock County
Solar
250 MWOperating Rock, WIMISO Jun 20172022
Solar project J947, Grant County
Solar
200 MWOperating Grant, WIMISO Jun 20172023
Solar project J870, Grant County
Solar
200 MWOperating Grant, WIMISO Jun 20172020
Solar project J886, Manitowoc County
Solar
150 MWOperating Manitowoc, WIMISO Jun 20172020
Solar project J864, Richland County
Solar
50.0 MWOperating Richland, WIMISO Jun 20172022
Gas project J831, Ozaukee County
Gas
48.0 MWOperating Ozaukee, WIMISO Jun 20172019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)