United States › Grid › Interconnection queues › Wisconsin
SOLAR · MISOSolar project J864, Richland County
Solar project J864, Richland County is a 50.0 MW solar request built and operating in the MISO interconnection queue, in Richland County, Wisconsin, connecting to American Transmission Co..
Request details
- Queue ID
- J864
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- American Transmission Co.
- Connection point (POI)
- Lone Rock 69kV Substation
- Location
- Richland County, Wisconsin
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: In Service
- Queue status
- Operational
- Entered queue
- 16 June 2017
- Agreement signed
- 27 April 2020
- Proposed online date
- September 2022
- Came online
- September 2022
Location
Marker shows the centre of Richland County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem