United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in West Virginia (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5480 MW
Active in queue480 MW5 requests
Agreement signed480 MW5 requests
Withdrawn12862 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Deep Lake Solar
Solar
150 MWAgreement signed Nicholas, WVPJM Mar 2020target 2029
Nicholas Solar
Solar
100 MWAgreement signed Nicholas, WVPJM Mar 2020target 2029
New Haven Solar
Solar
100 MWAgreement signed Mason, WVPJM Mar 2020target 2028
Franklintown Farm Solar and BESS
Solar + storage
80.0 MWAgreement signed Jefferson, WVPJM Sep 2020target 2028
Mea Nug
Other
50.0 MWAgreement signed Monongalia, WVPJM Sep 2020target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)