United States βΊ Grid βΊ Interconnection queues βΊ Washington
OCTARY USA Β· INTERCONNECTION QUEUESGas interconnection queue in Washington
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project G0760, Grant County Gas |
990 MW | In study |
| Gas project 12-051, Cowlitz County Gas |
375 MW | Paused / redesign |
| Gas project G1008, Clark County Gas |
286 MW | In study |
| Gas project 113, Lewis County Gas |
219 MW | Paused / redesign |
| Gas project 114, Kitsap County Gas |
215 MW | Paused / redesign |
| Gas project 54, Grays Harbor County Gas |
199 MW | Paused / redesign |
| Gas project 153, Skagit County Gas |
188 MW | In study |
| Gas project 152, Whatcom County Gas |
188 MW | In study |
| Gas project 41, Lincoln County Gas |
0.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)