United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Washington (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8588 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn8588 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project G0515, Lewis County
Onshore wind
150 MWWithdrawn / abandoned Lewis, WAWest Oct 2015target 2017
Onshore wind project 42, Lewis County
Onshore wind
150 MWWithdrawn / abandoned Lewis, WAWest May 2015target 2017
Onshore wind project 46, Adams County
Onshore wind
126 MWWithdrawn / abandoned Adams, WAWest Oct 2015
Onshore wind project 45, Kittitas County
Onshore wind
80.0 MWWithdrawn / abandoned Kittitas, WAWest Oct 2015target 2029
Other project 658, Clark County
Other Β· OR Solar 4, LLC
60.0 MWWithdrawn / abandoned Clark, WAWest Apr 2015target 2016
Solar project G0508, Benton County
Solar
20.0 MWWithdrawn / abandoned Benton, WAWest Mar 2015target 2016
Battery storage project 41, Whatcom County
Battery storage
2.0 MWWithdrawn / abandoned Whatcom, WAWest Jan 2015target 2015
Battery storage project 43, Whatcom County
Battery storage
0.3 MWWithdrawn / abandoned Whatcom, WAWest Jun 2015target 2015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)