United States βΊ Grid βΊ Interconnection queues βΊ Washington
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Washington (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project G0515, Lewis County Onshore wind |
150 MW | Withdrawn / abandoned |
| Onshore wind project 42, Lewis County Onshore wind |
150 MW | Withdrawn / abandoned |
| Onshore wind project 46, Adams County Onshore wind |
126 MW | Withdrawn / abandoned |
| Onshore wind project 45, Kittitas County Onshore wind |
80.0 MW | Withdrawn / abandoned |
| Other project 658, Clark County Other Β· OR Solar 4, LLC |
60.0 MW | Withdrawn / abandoned |
| Solar project G0508, Benton County Solar |
20.0 MW | Withdrawn / abandoned |
| Battery storage project 41, Whatcom County Battery storage |
2.0 MW | Withdrawn / abandoned |
| Battery storage project 43, Whatcom County Battery storage |
0.3 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)