Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project AH1-712, Fluvanna County Gas Β· Tenaska Power Generation, LLC |
776 MW | In study |
| Gas project AH1-723, Fluvanna County Gas Β· Tenaska Power Generation, LLC |
776 MW | In study |
| Chesterfield CT Units 3&4 Gas |
569 MW | Agreement signed |
| Chesterfield CT Units 1 and 2 Gas Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
569 MW | In study |
| Gas project AH1-679, Hanover County Gas Β· Doswell Limited Partnership |
20.0 MW | In study |
| Gas project AI2-020, Warren County Gas |
19.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)