Gas interconnection queue in Virginia

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown62,729 MW
Active in queue2,729 MW6 requests
Agreement signed569 MW1 requests
Withdrawn5322.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project AH1-712, Fluvanna County
Gas Β· Tenaska Power Generation, LLC
776 MWIn study Fluvanna, VAPJM Apr 2025
Gas project AH1-723, Fluvanna County
Gas Β· Tenaska Power Generation, LLC
776 MWIn study Fluvanna, VAPJM Apr 2025
Chesterfield CT Units 3&4
Gas
569 MWAgreement signed Chesterfield, VAPJM Sep 2019target 2029
Chesterfield CT Units 1 and 2
Gas Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
569 MWIn study Chesterfield, VAPJM Sep 2019target 2029
Gas project AH1-679, Hanover County
Gas Β· Doswell Limited Partnership
20.0 MWIn study Hanover, VAPJM Apr 2025
Gas project AI2-020, Warren County
Gas
19.0 MWIn study Warren, VAPJM Dec 2022target 2022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)