United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Virginia (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown82,565 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn82,565 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project Y2-097, Brunswick County
Gas
1,551 MWWithdrawn / abandoned Brunswick, VAPJM Oct 2012target 2018
Gas project Y2-058
Gas
762 MWWithdrawn / abandoned VAPJM Aug 2012target 2017
Onshore wind project Y1-029, Accomack County
Onshore wind
99.0 MWWithdrawn / abandoned Accomack, VAPJM Feb 2012target 2014
Poplar Camp
Onshore wind
72.0 MWWithdrawn / abandoned Carroll, VAPJM Feb 2012target 2023
Onshore wind project Y1-008, Accomack County
Onshore wind
50.0 MWWithdrawn / abandoned Accomack, VAPJM Feb 2012target 2014
Four Rivers NUG CC-1
Gas
20.0 MWWithdrawn / abandoned Hanover, VAPJM Apr 2012target 2016
Suffolk Landfill Units 1-10
Other
9.0 MWWithdrawn / abandoned City Of Suffolk, VAPJM Sep 2012target 2015
Fauquier County Landfill Units 1 & 2
Other
2.0 MWWithdrawn / abandoned Fauquier, VAPJM Oct 2012target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)