OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Virginia (2012 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project Y2-097, Brunswick County Gas |
1,551 MW | Withdrawn / abandoned |
| Gas project Y2-058 Gas |
762 MW | Withdrawn / abandoned |
| Onshore wind project Y1-029, Accomack County Onshore wind |
99.0 MW | Withdrawn / abandoned |
| Poplar Camp Onshore wind |
72.0 MW | Withdrawn / abandoned |
| Onshore wind project Y1-008, Accomack County Onshore wind |
50.0 MW | Withdrawn / abandoned |
| Four Rivers NUG CC-1 Gas |
20.0 MW | Withdrawn / abandoned |
| Suffolk Landfill Units 1-10 Other |
9.0 MW | Withdrawn / abandoned |
| Fauquier County Landfill Units 1 & 2 Other |
2.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)