United States › Grid › Interconnection queues › Virginia
OTHER · PJMFauquier County Landfill Units 1 & 2
Fauquier County Landfill Units 1 & 2 is a 2.0 MW other request withdrawn in the PJM interconnection queue, in Fauquier County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2012 (completed)
- Withdrawn / abandonedMar 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y2-099
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Warrenton 34.5kV
- Location
- Fauquier County, Virginia
- Technology
- Other: 2.0 MW
- Total requested
- 2.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 31 October 2012
- Proposed online date
- June 2016
- Withdrawn
- March 2016
Location
Marker shows the centre of Fauquier County; the queue data does not give exact sites.
Other requests in Fauquier County
- Remington BESSBattery storage · 100 MW · agreement signed
- Battery storage project AH2-084, Fauquier CountyBattery storage · 125 MW · in study
- Solar project AI2-079, Fauquier CountySolar · 40.7 MW · in study
- Solar project AH1-345, Fauquier CountySolar · 14.0 MW · in study
- Solar project AB2-029, Fauquier CountySolar · 19.8 MW · built
- Remington GT4Gas · 15.0 MW · built
- Remington GT1Gas · 15.0 MW · built
- Remington GT3Gas · 15.0 MW · built
- Remington GT2Gas · 15.0 MW · built
- Gas project W1-074, Fauquier CountyGas · 610 MW · withdrawn
- Gas project X3-076, Fauquier CountyGas · 510 MW · withdrawn
- Fitch SolarSolar · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem