United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMRemington BESS
Remington BESS is a 100 MW battery storage request with a signed interconnection agreement in the PJM interconnection queue, in Fauquier County, Virginia, connecting to Dominion.
Queue statusConsented
- PlanningQueued Sep 2020 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Sep 2029 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AG1-152
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Remington CT 230 kV
- Location
- Fauquier County, Virginia
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Active
- Entered queue
- 10 September 2020
- Proposed online date
- September 2029
Location
Marker shows the centre of Fauquier County; the queue data does not give exact sites.
Other requests in Fauquier County
- Battery storage project AH2-084, Fauquier CountyBattery storage · 125 MW · in study
- Solar project AI2-079, Fauquier CountySolar · 40.7 MW · in study
- Solar project AH1-345, Fauquier CountySolar · 14.0 MW · in study
- Solar project AB2-029, Fauquier CountySolar · 19.8 MW · built
- Remington GT4Gas · 15.0 MW · built
- Remington GT1Gas · 15.0 MW · built
- Remington GT3Gas · 15.0 MW · built
- Remington GT2Gas · 15.0 MW · built
- Gas project W1-074, Fauquier CountyGas · 610 MW · withdrawn
- Gas project X3-076, Fauquier CountyGas · 510 MW · withdrawn
- Fitch SolarSolar · 200 MW · withdrawn
- Solar project AE1-022, Fauquier CountySolar · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem