United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AE1-022, Fauquier County
Solar project AE1-022, Fauquier County is a 200 MW solar request withdrawn in the PJM interconnection queue, in Fauquier County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2018 (completed)
- Withdrawn / abandonedJun 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE1-022
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Morrisville 230 kV
- Location
- Fauquier County, Virginia
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 25 May 2018
- Proposed online date
- November 2020
- Withdrawn
- June 2018
Location
Marker shows the centre of Fauquier County; the queue data does not give exact sites.
Other requests in Fauquier County
- Remington BESSBattery storage Β· 100 MW Β· agreement signed
- Battery storage project AH2-084, Fauquier CountyBattery storage Β· 125 MW Β· in study
- Solar project AI2-079, Fauquier CountySolar Β· 40.7 MW Β· in study
- Solar project AH1-345, Fauquier CountySolar Β· 14.0 MW Β· in study
- Solar project AB2-029, Fauquier CountySolar Β· 19.8 MW Β· built
- Remington GT4Gas Β· 15.0 MW Β· built
- Remington GT1Gas Β· 15.0 MW Β· built
- Remington GT3Gas Β· 15.0 MW Β· built
- Remington GT2Gas Β· 15.0 MW Β· built
- Gas project W1-074, Fauquier CountyGas Β· 610 MW Β· withdrawn
- Gas project X3-076, Fauquier CountyGas Β· 510 MW Β· withdrawn
- Fitch SolarSolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem