United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

GAS Β· PJM

Gas project Y2-058

Gas project Y2-058 is a 762 MW gas request withdrawn in the PJM interconnection queue, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2012 (completed)
  2. Withdrawn / abandonedJun 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Y2-058
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Broadford-Jackson's Ferry 765kV
Location
Virginia
Technology
Gas: 762 MW
Total requested
762 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
27 August 2012
Proposed online date
May 2017
Withdrawn
June 2015

Location

No county location in the queue data.

Power plants in Virginia Β· Transmission lines in Virginia

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem