Completed queue projects in Virginia (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown41,651 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn112,323 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Brunswick Combined Cycle Power Station
Gas
1,526 MWOperating Brunswick, VAPJM Jul 20112016
Altavista Power Station
Other
60.0 MWOperating Campbell, VAPJM Apr 20112013
Franklin Mill Power Facility
Gas
35.0 MWOperating City Of Franklin, VAPJM Mar 20112012
MeadWestvaco Covington Mill Site
Other
30.0 MWOperating City Of Covington, VAPJM Jun 20112013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)