OTHER · PJMMeadWestvaco Covington Mill Site
MeadWestvaco Covington Mill Site is a 30.0 MW other request built and operating in the PJM interconnection queue, in City Of Covington County, Virginia, connecting to Dominion.
Request details
- Queue ID
- X2-060
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- East Mill 138kV
- Location
- City Of Covington County, Virginia
- Technology
- Other: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 30 June 2011
- Proposed online date
- June 2014
- Came online
- October 2013
Location
Marker shows the centre of City Of Covington County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem