United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Virginia (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8195 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn142,057 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Warren County
Gas
60.0 MWOperating Warren, VAPJM Aug 20102014
South Boston Energy Facility
Other
47.4 MWOperating Halifax, VAPJM Jun 20102013
Oak Hall Project C
Solar
20.0 MWOperating VAPJM Feb 20102016
Oak Hall Project A
Solar
20.0 MWOperating VAPJM Feb 20102016
Oak Hall Project B
Solar
20.0 MWOperating VAPJM Feb 20102016
Oak Hall Project D
Solar
20.0 MWOperating VAPJM Feb 20102016
King and Queen
Other
4.0 MWOperating King And Queen, VAPJM Apr 20102011
I-95 Landfill Phase 2
Other
3.2 MWOperating Fairfax, VAPJM Aug 20102011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)