United States › Grid › Interconnection queues › Virginia
OTHER · PJMI-95 Landfill Phase 2
I-95 Landfill Phase 2 is a 3.2 MW other request built and operating in the PJM interconnection queue, in Fairfax County, Virginia, connecting to Dominion.
Request details
- Queue ID
- W3-002
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Occoquan 34.5kV
- Location
- Fairfax County, Virginia
- Technology
- Other: 3.2 MW
- Total requested
- 3.2 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 2 August 2010
- Proposed online date
- April 2011
- Came online
- April 2011
- Withdrawn
- November 2019
Location
Marker shows the centre of Fairfax County; the queue data does not give exact sites.
Other requests in Fairfax County
- Ogden MartinOther · 18.0 MW · built
- Battery storage project AG2-286, Fairfax CountyBattery storage · 150 MW · withdrawn
- Battery storage project AG2-326, Fairfax CountyBattery storage · 100 MW · withdrawn
- Other project X3-055, Fairfax CountyOther · 10.0 MW · withdrawn
- Other project AH1-197, Fairfax CountyOther · 7.1 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem