United States › Grid › Interconnection queues › Virginia

OTHER · PJM

I-95 Landfill Phase 2

I-95 Landfill Phase 2 is a 3.2 MW other request built and operating in the PJM interconnection queue, in Fairfax County, Virginia, connecting to Dominion.

Queue statusOperating
  1. PlanningQueued Aug 2010 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingApr 2011 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
W3-002
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Occoquan 34.5kV
Location
Fairfax County, Virginia
Technology
Other: 3.2 MW
Total requested
3.2 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
2 August 2010
Proposed online date
April 2011
Came online
April 2011
Withdrawn
November 2019

Location

Marker shows the centre of Fairfax County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Fairfax County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem