πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Utah (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown132,077 MW
Active in queue2,077 MW13 requests
Agreement signed0.0 MW0 requests
Withdrawn7813.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project PIS087, Salt Lake County
Battery storage
500 MWIn study Salt Lake, UTWest Sep 2024target 2027
Solar + storage project NC5-010, Kane County
Solar + storage
500 MWIn study Kane, UTWest Mar 2024target 2028
Battery storage project PIS088, Salt Lake County
Battery storage
199 MWIn study Salt Lake, UTWest Sep 2024target 2028
Solar project PIS056, Emery County
Solar Β· PacifiCorp
178 MWIn study Emery, UTWest May 2024target 2026
Solar project PIS057, Emery County
Solar Β· PacifiCorp
125 MWIn study Emery, UTWest May 2024target 2026
Battery storage project S0033, Washington County
Battery storage
122 MWIn study Washington, UTWest Dec 2024target 2027
Battery storage project S0031, Box Elder County
Battery storage
80.0 MWIn study Box Elder, UTWest Aug 2024target 2026
Battery storage project S0034, Juab County
Battery storage
80.0 MWIn study Juab, UTWest Dec 2024target 2026
Gas project PIS092, Utah County
Gas Β· PacifiCorp
73.0 MWIn study Utah, UTWest Oct 2024target 2026
Gas project PIS093, Juab County
Gas Β· PacifiCorp
71.0 MWIn study Juab, UTWest Oct 2024target 2026
Solar project PIS058, Emery County
Solar Β· PacifiCorp
70.0 MWIn study Emery, UTWest May 2024target 2026
Gas project PIS090, Utah County
Gas Β· PacifiCorp
62.0 MWIn study Utah, UTWest Oct 2024target 2026
Gas project PIS091, Salt Lake County
Gas Β· PacifiCorp
17.0 MWIn study Salt Lake, UTWest Oct 2024target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)