Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project PIS087, Salt Lake County Battery storage |
500 MW | In study |
| Solar + storage project NC5-010, Kane County Solar + storage |
500 MW | In study |
| Battery storage project PIS088, Salt Lake County Battery storage |
199 MW | In study |
| Solar project PIS056, Emery County Solar Β· PacifiCorp |
178 MW | In study |
| Solar project PIS057, Emery County Solar Β· PacifiCorp |
125 MW | In study |
| Battery storage project S0033, Washington County Battery storage |
122 MW | In study |
| Battery storage project S0031, Box Elder County Battery storage |
80.0 MW | In study |
| Battery storage project S0034, Juab County Battery storage |
80.0 MW | In study |
| Gas project PIS092, Utah County Gas Β· PacifiCorp |
73.0 MW | In study |
| Gas project PIS093, Juab County Gas Β· PacifiCorp |
71.0 MW | In study |
| Solar project PIS058, Emery County Solar Β· PacifiCorp |
70.0 MW | In study |
| Gas project PIS090, Utah County Gas Β· PacifiCorp |
62.0 MW | In study |
| Gas project PIS091, Salt Lake County Gas Β· PacifiCorp |
17.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)