United States βΊ Grid βΊ Interconnection queues βΊ Utah
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Utah (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 710, Kane County Solar |
204 MW | Withdrawn / abandoned |
| Solar project 683, Beaver County Solar |
80.0 MW | Withdrawn / abandoned |
| Onshore wind project 714, Washington County Onshore wind |
52.9 MW | Withdrawn / abandoned |
| Onshore wind project 717, Washington County Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Solar project 685, Beaver County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project 647, Iron County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project 681, Beaver County Solar |
20.0 MW | Withdrawn / abandoned |
| Hydro project 656, Utah County Hydro |
11.5 MW | Withdrawn / abandoned |
| Hydro project 645, Utah County Hydro |
11.5 MW | Withdrawn / abandoned |
| Solar project 649, Washington County Solar |
10.3 MW | Withdrawn / abandoned |
| Solar project 680, Iron County Solar |
8.0 MW | Withdrawn / abandoned |
| Other project 655, Davis County Other Β· Georgia-Pacific Consumer Projects (Camas), LLC |
7.1 MW | Withdrawn / abandoned |
| Solar project 679, Iron County Solar |
3.3 MW | Withdrawn / abandoned |
| Solar project 678, Iron County Solar |
3.3 MW | Withdrawn / abandoned |
| Other project 722, Salt Lake County Other |
3.2 MW | Withdrawn / abandoned |
| Solar project 709, Iron County Solar |
3.0 MW | Withdrawn / abandoned |
| Hydro project 704, Cache County Hydro |
0.2 MW | Withdrawn / abandoned |
| Hydro project 686, Cache County Hydro |
0.2 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)