United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in South Dakota (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project J1989, Brown County Onshore wind |
250 MW | Withdrawn / abandoned |
| Battery storage project GEN-2021-009, Beadle County Battery storage |
225 MW | Withdrawn / abandoned |
| Solar project J2003, Deuel County Solar |
150 MW | Withdrawn / abandoned |
| Battery storage project J2005, Deuel County Battery storage |
75.0 MW | Withdrawn / abandoned |
| Gas project 403, Brown County Gas |
5.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)3 Β· 475 MW
- SPP (Southwest Power Pool)1 Β· 225 MW
- West (non-ISO utilities)1 Β· 5.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)