Withdrawn queue requests in South Dakota (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4648 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn4648 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GI-1216, Bon Homme County
Onshore wind
250 MWWithdrawn / abandoned Bon Homme, SDWest Dec 2012target 2015
Onshore wind project J266, Roberts County
Onshore wind
200 MWWithdrawn / abandoned Roberts, SDMISO Nov 2012target 2014
Onshore wind project GI-1209, Charles Mix County
Onshore wind Β· Pioneer Energy
99.0 MWWithdrawn / abandoned Charles Mix, SDWest Jun 2012target 2014
Onshore wind project GI-1214, Brown County
Onshore wind Β· Day County Wind II
99.0 MWWithdrawn / abandoned Brown, SDWest Oct 2012target 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)