United States β€Ί Grid β€Ί Interconnection queues β€Ί South Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in South Carolina (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4207 MW
Active in queue66.0 MW2 requests
Agreement signed0.0 MW0 requests
Withdrawn648,313 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 81, Marlboro County
Solar
75.0 MWOperating Marlboro, SCSoutheast Jan 2018target 2018
Solar project 72, Richland County
Solar
75.0 MWOperating Richland, SCSoutheast Jan 2018target 2020
Solar project 74, Horry County
Solar Β· Landrace
55.0 MWOperating Horry, SCSoutheast Jan 2018target 2019
Solar project 20832, Marion County
Solar
2.0 MWOperating Marion, SCSoutheast May 2018target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)