United States › Grid › Interconnection queues › South Carolina
SOLAR · SOUTHEASTSolar project 81, Marlboro County
Solar project 81, Marlboro County is a 75.0 MW solar request built and operating in the Southeast interconnection queue, in Marlboro County, South Carolina, connecting to Santee Cooper.
Request details
- Queue ID
- 81
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Marlboro County, South Carolina
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Complete
- Queue status
- Operational
- Entered queue
- 26 January 2018
- Proposed online date
- December 2018
Location
Marker shows the centre of Marlboro County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Marlboro County
- Solar project 956538, Marlboro CountySolar · 75.0 MW · in study
- Other project PP00057, Marlboro CountyOther · 74.9 MW · in study
- Solar project 957368, Marlboro CountySolar · 74.9 MW · in study
- Other project PP00055, Marlboro CountyOther · 74.9 MW · in study
- Solar project 968547, Marlboro CountySolar · 10.0 MW · in study
- Other project 28, Marlboro CountyOther · 51.0 MW · built
- Solar project 566096, Marlboro CountySolar · 200 MW · withdrawn
- Solar project 184484, Marlboro CountySolar · 160 MW · withdrawn
- Solar project 164, Marlboro CountySolar · 125 MW · withdrawn
- Solar project 168, Marlboro CountySolar · 125 MW · withdrawn
- Solar project 207, Marlboro CountySolar · 88.2 MW · withdrawn
- Solar project 898445, Marlboro CountySolar · 88.2 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem