United States β€Ί Grid β€Ί Interconnection queues β€Ί Rhode Island

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Rhode Island (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown482.5 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn213.1 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
University Solar
Solar
31.3 MWOperating Kent, RIISO-NE Nov 2017target 2020
Johnston Landfill Wind
Onshore wind
21.0 MWOperating Providence, RIISO-NE Nov 2017target 2018
Solar
Solar
16.3 MWOperating Providence, RIISO-NE Nov 2017target 2019
Alton Solar
Solar
13.9 MWOperating Washington, RIISO-NE Nov 2017target 2020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)